Phase 2 of Concord Brentwood to Include 825 Units
The rezoning application for Phase 2 of Concord Pacific’s Concord Brentwood project is moving to first reading. The overall project master plan was approved by the City of Burnaby in 2016, with individual phases requiring detailed rezoning applications.
The first phases of the project (1a and 1b) are currently under construction and summarized as follows:
- Hillside West – two towers (44 & 49-storeys), 892 units. Sold out in early 2018.
- Hillside East – two towers (55 & 45-storeys), 900 units. Over 90% sold out.
Phase 2 of the site is located within the “Flatlands” subarea of the overall site, and fronts the future Dawson Street extension and Yukon Crescent. Phase 2 totals 204,000 SF and consists of two high-rise residential buildings, one mid-rise residential building, a low-rise residential podium, common amenities (super club), and street oriented retail uses atop, and fronting, underground and structured parking.
Details include:
- A 45-storey tower, a 50-storey tower, and an 18-storey tower
- 825 total condo units;
- 247 one-bedrooms, 438 two-bedrooms & 218 three-bedrooms;
- 50,000 SF of retail space (0.25 FAR);
- A 31,000 SF “Super Club” serving all phases of the project that includes fitness space with gym, pool, bowling alley & spa.
- A total density of 4.97 FAR;
- 1,001 underground parking spaces;
- New roadways including:
- Extension of Dawson Street
- Construction of Douglas Road/Delta Avenue and Lougheed Hwy intersection
- New pedestrian and cycling routes