West Van Condo Proposal Revived After Five Years
A revised development proposal by IKOR Group for 1763 Bellevue Avenue is back at council after five years on ice, and over a decade since it was originally proposed.
The 12,190 SF site is located on the north side of the 1700 Block of Bellevue in the Ambleside area. It is currently developed with a two-storey building (formerly the Masonic Hall).
Earlier proposals for mid-rise buildings on the site had been made between 2014 and 2021, but were ultimately shelved pending the completion of the Ambleside Local Area Plan, which was close to final adoption earlier this year, but has not been adopted.
The Ambleside LAP identifies the site as “Waterfront G” which envisions new commercial or mixed-use development up to 3.5-4.0 FAR and 10-12 storeys.
The current proposal for the site is a 9-storey condo building that includes:
- 24 condo units;
- 20 two-bedroom units, 4 three-bedroom units;
- 2 commercial/office units fronting Bellevue;
- a total density of 3.47 FSR;
- 43 underground parking stalls;
- 6,800 SF of community space on the 2nd floor.
SSThe architect for the project is Arcadis.





