Vancouver Market - Chronicling Investment and Development Activity in Metro Vancouver
  • Home
  • Listings & Sales
  • Land Assembly
    • Official Community Plans (OCPs)
      • City of Burnaby
      • City of North Vancouver
      • District of North Vancouver
      • City of Vancouver
      • District of West Vancouver
    • Transit Oriented Areas (TOA) Policy
      • City of Burnaby
      • City of New Westminster
      • City of Vancouver
      • Transit Oriented Areas: How New Zoning Policy Affects Landowners
  • About
  • Subscribe
Vancouver Market - Chronicling Investment and Development Activity in Metro Vancouver
Home
Listings & Sales
Land Assembly
    Official Community Plans (OCPs)
    City of Burnaby
    City of North Vancouver
    District of North Vancouver
    City of Vancouver
    District of West Vancouver
    Transit Oriented Areas (TOA) Policy
    City of Burnaby
    City of New Westminster
    City of Vancouver
    Transit Oriented Areas: How New Zoning Policy Affects Landowners
About
Subscribe
  • Home
  • Listings & Sales
  • Land Assembly
    • Official Community Plans (OCPs)
      • City of Burnaby
      • City of North Vancouver
      • District of North Vancouver
      • City of Vancouver
      • District of West Vancouver
    • Transit Oriented Areas (TOA) Policy
      • City of Burnaby
      • City of New Westminster
      • City of Vancouver
      • Transit Oriented Areas: How New Zoning Policy Affects Landowners
  • About
  • Subscribe
Development, Office

Rize Alliance Planning 150,000 SF Office Building on Terminal

Rize Alliance has submitted their development application for The Grid, a 10-storey office and light industrial project located on the South side of Terminal Avenue (306 Terminal), currently a Tim Hortons.

Details include:

  • Ground floor brewery/distillery/ancillary restaurant space;
  • 29,000 SF of industrial/manufacturing space;
  • 118,000 SF of office space;
  • 3 levels of underground parking w/192 stalls;
  • a building height of 48 ft.; and
  • a total density of 5.0 FSR.

Under the site’s existing I-3 zoning, the application is “conditional” so it may be permitted; however, it requires the decision of the Director of Planning.

A description of the project is provided in the application: “The project seeks to provide flexible floor plates that are suitable for all approved uses in the I-3 Zoning District Schedule. This is accomplished by providing open floor plans with generous floor-to-floor heights and robust electrical and mechanical infrastructure. Each suite is organized around a compact central core allowing for daylight penetration deep into the floorplate. Access to daylight, fresh air and views are provided through double height exterior communal spaces on the upper levels 3-10. The central core will connect tenants to a robust loading facility located on the ground floor level complete with a shared freight elevator servicing the industrial areas, and as well to an enhanced end of trip facility for commuters located on L2. The main level exterior plaza will provide opportunity for a communal social space for the occupants of the building, while also encouraging pedestrian flow from Terminal Avenue South into the Creative hub. “

The architect for the project is OMB.

Rize acquired the site in 2017 for $15,500,000, or $106 per buildable SF.

March 30, 2020by david.taylor@colliers.com
Condo, Development

68-Unit Condo Building Slated for Cambie Street

A rezoning application has been submitted for a three-lot land assembly on Cambie Street, just North of West 62nd Avenue.

The site at 7730-7770 Cambie Street is 25,511 SF and currently zoned RT-1.

The proposal calls for two 6-storey residential buildings with townhouses at grade. Details include:

  • 68 condo units;
    • 6 studios, 21 one-bedrooms, 21 two-bedrooms & 7 three-bedrooms;
  • a total density of 2.70 FSR;
  • a maximum height of 67 ft) for Building A and 61 ft. for Building B; and
  • 94 underground parking stalls and 163 bicycle spaces.

The application is being considered under the Cambie Corrirdor Plan.

The site was assembled in 2016 for $14,200,000, or $199 per buildable SF.

The architect for the project is Ankenman Marchand.

March 28, 2020by david.taylor@colliers.com
Condo, Development

57-Unit Project Planned for East Broadway

A rezoning application has been submitted by Lotus Capital for a 4-lot land assembly at 2246-2268 East Broadway. The proposal is for a 6-storey condo building that includes:

  • 57 condo units
    • 24 studios, 11 one bedrooms, 16 two-bedrooms & 6 three-bedrooms;
  • a total density of 2.65 FSR;
  • a building height of 64 ft.; and
  • 47 underground parking stalls, 4 surface parking stalls, and 114 bicycle spaces.

The application is being considered under the Grandview-Woodland Community Plan.

The architect for the project is Omicron.

March 27, 2020by david.taylor@colliers.com
Page 155 of 710« First...102030«154155156157»160170180...Last »

Search the Site

Tweets by vancouvermrkt

Categories

  • Apartment
  • Condo
  • Development
  • For Sale
  • Hotel
  • Investment
  • Land
  • Market Research
  • Office
  • Rental
  • Retail


David Taylor Personal Real Estate Corporation

Colliers International

© 2019 Copyright  |  All Rights Reserved