A rezoning application has been submitted to the City of Port Moody for a for a two-lot land assembly in Port Moody at 148-154 James Road, just East of Moody Middle School. The two lots are currently single family and total 17,973 SF.
The plan for the site is for a new 6-storey rental project that includes:
Westbank has submitted their formal rezoning application for the Safeway site on East Broadway, just East of Commercial Drive.
The site at 1780 East Broadway totals 105,965 SF and is currently zoned C-3A, but was redesignated to allow a site-specific rezoning as part of the Grandview Woodland Community Plan.
The proposal consists of a mixed-use development with three residential towers (including strata, rental and social housing units), retail, office, a childcare facility, and a new public plaza.
Details include:
680 total residential units;
520 condos
160 rental apartments;
a 53,000 SF Safeway store;
20,000 SF of additional retail space;
61,300 SF of office space;
a childcare facility;
652 parking spaces;
unique “hanging gardens” in the interior courtyard;
a 20,000 SF public plaza running parallel to the SkyTrain station; and
a total combined density of 5.87 FSR.
The application is being considered under the Grandview-Woodland Community Plan.
Polygon has submitted a rezoning application for a site in the Edmonds area of Burnaby that it has acquired from the City of Burnaby by public tender in late 2017. The completion of the sale is subject to achieving the rezoning.
The 3.7 acre site is located at the northeast comer of Southridge Drive and Byrnepark Drive and currently vacant and treed. It is one of seven City-owned sites in a mostly wooded area of Edmonds. Four of those sites have been sold and developed (Ledgestone – 2003-2005 & Adera Green 2009-2010).
The proposal for the Polygon site is for a 5-storey residential building that includes:
A rezoning application has been submitted for the Lakewood Multicultural United Church site a the Northeast corner of East 12th Avenue and Semlin Drive in the Grandview Woodland area of East Vancouver.
The Church is located just South of the Skytrain line on a 31,381 SF irregularly shaped site. The property was redesignated for medium density development under the Grandview Woodland Community Plan.
The plan for the site is a mixed-use building with a new church and a 6-storey residential building. The project will be 100% rental housing project is developed in partnership with BC Housing to be owned and operated by BCUCC. A minimum of 30% of these homes will be permanently secured as affordable housing, to be occupied by households with incomes below the Housing Income Limits (HILS) at a rent tied to household income. Details include:
104 rental apartment units (30% as Affordable Housing, 70% as market);
7,415 SF of church space at grade;
a total density of 2.47 FSR;
a building height of 65 ft.; and
43 underground parking stalls and 224 bike spaces.
The application describes the rezoning rationale: ” Our design proposal is a carefully considered response to the neighbouring context with a mind to Passive House principles. The following are key factors in determining the design of the building:
Situating the Church along E 12th Avenue to allow for a greater Church presence and visibility along the building’s most public face;
Allowing the landscaped courtyard to act as a buffer between our new development and the Lakewood Terrace Co-op;
Stepping down the building form along the north edge of Semlin Drive as transitional massing to lower density buildings towards the north;
Providing a highly articulated facade in the form of articulated balconies and sunshading devices aligned with Passive House Design Principles;
Increasing occupant access to green space via outdoor amenity space.”
Beedie has submitted a rezoning application to the City of Burnaby for a two acre site at 3133 Sumner Avenue. The site is located between Canada Way and Highway 1, just East of Gilmore and across the street from the Grand Villa Casino.
The site is currently zoned M1 but the rezoning seeks a designation based on the M2 General Industrial District, M5 Light Industrial District and C1 Neighbourhood Commercial District. The site is in the OCP for “Business Centre Development”.
The rezoning plan is to permit the construction of a 5-storey light industrial and office building with a small retail component. Details include:
111,779 SF of office space;
58,488 SF manufacturing/industrial space;
2,577 SF of retail space;
495 parking spaces;
a total density of 1.98 FAR.
The development concept includes “extensive glazing and architectural character. The first two floors provide a number of flexible, high-volume, industrial spaces with some common amenities on the ground floor. A ground floor commercial/restaurant space is also proposed, which would provide a commercial amenity to the area. The top three floors provide for office spaces.”
First Capital REIT --> Choice Properties REIT and Kingsett Capital are teaming up to acquire the Canadian real estate company in a deal valued at over $9 billion, including assumed debt. Choice Properties will acquire roughly five billion dollars worth of shopping centres, while